Ergil pleased to announce the successful completion a project for our client, Harouge Oil Operations in Libya. This project supplied a Gas Boot for Ghani Oil Tank Replacement, covering design, material supply, fabrication, inspection, testing, and packaging.
First of all, degassing boot separates gases from crude oil in oilfield facilities. It’s a vertical vessel with internals and instruments. It operates under pressure and is crucial for removing gases from process fluids in Petrochemical Processing Plants. Ergil’s Gas Boot Tank, 1000mm x 12200mm, meets ASME Sec.VIII Div.1 standards, with 3.45 barg design pressure and -18 to +94 °C temperature range. Built with SA516-70N materials, it includes a mist eliminator, ladders, and platforms.
Thanks to Harouge Oil Operations for entrusting us. Stay tuned for our ongoing commitment to excellence in oil and gas engineering.