Successful Completion of Gas Boot Tank Project

Successful Completion of Gas Boot Tank Project

Ergil pleased to announce the successful completion a project for our client, Harouge Oil Operations in Libya. This project supplied a Gas Boot for Ghani Oil Tank Replacement, covering design, material supply, fabrication, inspection, testing, and packaging.

First of all, degassing boot separates gases from crude oil in oilfield facilities. It’s a vertical vessel with internals and instruments. It operates under pressure and is crucial for removing gases from process fluids in Petrochemical Processing Plants. Ergil’s Gas Boot Tank, 1000mm x 12200mm, meets ASME Sec.VIII Div.1 standards, with 3.45 barg design pressure and -18 to +94 °C temperature range. Built with SA516-70N materials, it includes a mist eliminator, ladders, and platforms.

Thanks to Harouge Oil Operations for entrusting us. Stay tuned for our ongoing commitment to excellence in oil and gas engineering.

Location

Successful Completion of Gas Boot Tank Project 36

Details

Ergil's Gas Boot Tank, 1000mm x 12200mm, meets ASME Sec.VIII Div.1 standards, with 3.45 barg design pressure and -18 to +94 °C temperature range. Built with SA516-70N materials, it includes a mist eliminator, ladders, and platforms.

Contact us today to learn more?