Project Delivered: Integrated Pigging System – Chadar Field, Libya

Project Delivered: Integrated Pigging System – Chadar Field, Libya

Project Delivered: Integrated Pigging System – Chadar Field, Libya
We recently completed the turnkey delivery of two 8″x6″ Class 900 pig launcher and receiver units for a critical oil & gas project in Libya.

🔹 Full EPC scope
🔹 Skid-mounted, fully integrated design
🔹 97 barg / -2°C to +80°C operating range
🔹 ASME Sec. VIII Div.1 & ASME B31.4 compliance
🔹 Complete fabrication, assembly, testing, and CIF Libya delivery

This project demonstrates our ability to engineer and deliver reliable modular pigging systems for high-pressure pipeline operations—even under remote and technically challenging conditions.

#PiggingSystem #OilAndGas #PipelineEquipment #Aager #ERGIL #ProcessSolutions #LibyaProjects #SkidMounted #ModularDesign #TurnkeySolutions

Contact us today to learn more?