Pipeline Pigging Systems 30

Pig Launcher and Pig Receiver

Problem:

An offshore platform operating is full of the toughest challenges and any kind of equipment failure could have a huge negative impact on employee safety and lost production. Offshore engineers and scientists face different kinds of economical and technical issues in designing these platforms. Conducting operations further away from the coast is a very demanding and labor intensive process in terms of logistics and operation.

From this point of view, limited space and remote location require the equipment to adapt to harsh environmental conditions
Cost-effective delivery, efficient and durable products should be provided by experts and experienced people.
Manufacturing operations require high standards of safety and reliability.
Considering oil and gas platforms, what is expected from manufacturers is to provide regular service life and main tenance procedures for each equipment that will last for many years.

Access the complete Case Study file by sharing some information about yourself: