Baku - Tbilisi - Ceyhan Pipeline Emergency Drain Down Facility 33

Baku – Tbilisi – Ceyhan Pipeline Emergency Drain Down Facility

ERGIL was awarded for engineering, design, fabrication and construction of 8000m3 concrete underground reservoir with a secondary steel wall storage tank along with other facilities.

End User: BP
Location: Georgia

Location

Details

ERGIL was awarded for engineering, design, fabrication and construction of 8000m3 concrete underground reservoir with a secondary steel wall storage tank along with other facilities. End User: BP Location: Georgia

Related News

Table of Contents