ATMOSPHERIC VENTING & RELIEF DISPOSAL SYSTEMS

Vent Stack · Knock-Out Drum · Liquid Seal Drum
Complete Engineered Solutions for Safe Atmospheric Discharge

ENGINEERING · MANUFACTURING · COMMISSIONING

01 · WHY IT MATTERS

ATMOSPHERIC VENTING & RELIEF SYSTEMS

The final engineered barrier between overpressure and catastrophic failure

Every hydrocarbon processing facility operates under carefully controlled pressure boundaries. When those boundaries are challenged — by blocked outlets, runaway reactions, fire exposure, utility failure, or operator error — the plant’s pressure relief philosophy must respond reliably and without compromise.

Atmospheric venting and relief disposal systems constitute the terminal stage of that philosophy. They receive gas and vapor streams discharged from pressure relief valves, rupture discs, emergency depressurization valves, and process blowdowns, then route them safely to atmosphere — preventing liquid carryover onto grade, eliminating reverse flow and flashback risk, and dispersing vapor above the breathing zone.

Failure to engineer this system correctly results in liquid rain-out from vent stacks, back-ignition into relief headers, air ingress into flammable gas systems, or inadequate dispersion leading to vapor cloud formation at grade level. The consequences range from equipment damage to major loss-of-life events.

ERGIL Mersin manufacturing facility

ERGIL Mersin manufacturing facility — 60,000 m² in-house fabrication capability

0
INTEGRATED COMPONENTS
0+
YEARS EXPERIENCE
0+
COUNTRIES

INTEGRATED SYSTEM — PROCESS FLOW SEQUENCE

RELIEF SOURCES
PRVs · BDVs · RDs
▶ RELIEF HEADER
Collection piping
▶ KNOCK-OUT DRUM
Liquid separation
▶ SEAL DRUM
Hydraulic seal
▶ VENT STACK
Atmospheric discharge
▶ SAFE DISCHARGE
Above grade

INDUSTRIES SERVED

Refining Petrochemical Oil & Gas LNG Chemical Fertilizer Hydrogen Water Treatment Tank Farms

02 · COMPONENT · FIRST IN CLASS

COLD VENT STACK

Atmospheric dispersion of relief gases at safe elevation above occupied grade and ignition sources

Function: The vent stack elevates the point of atmospheric discharge to a height sufficient to ensure safe vapor dispersion per API 521 / EN 13237 requirements. It is the terminal point of the cold vent system, handling gases that have been stripped of entrained liquids by the upstream KOD and Seal Drum.

Operating Principle: Gas enters the stack from the Seal Drum outlet at near-atmospheric pressure. Stack diameter is sized for a maximum exit velocity (typically 0.5 Mach for sonic-tip designs) to prevent downdraft re-entrainment into the breathing zone. Self-supporting stacks are designed for combined wind, seismic, thermal, and vortex-shedding loads.

Structural Design: For stacks with slenderness ratio H/D exceeding 25, vortex-induced vibration (VIV) analysis is mandatory. ERGIL performs Strouhal frequency calculations and specifies aerodynamic spoilers or tuned mass dampers where required. Foundation loads are reported for civil design.

STACK CONFIGURATIONS
  • Self-supporting (free-standing)
  • Guyed-wire supported
  • Derrick-framed (>30 m)
  • Slip-joint sections
  • Sonic velocity tip
  • Open-pipe sub-sonic tip
  • Rain cap / weep hole
  • Purge gas (N₂ / fuel gas)
  • Aviation warning lights
MATERIALS AVAILABLE
  • Carbon steel (SA-516/A36)
  • 304L / 316L Stainless steel
  • Duplex 2205 / 2507
  • Alloy 20 / Hastelloy
  • Cladded shell (CS+SS)
  • NACE MR0175 compliant
ERGIL cold vent stack and liquid seal drum

ERGIL cold vent stack and liquid seal drum — integrated skid, factory acceptance test

03 · COMPONENT · FIRST STAGE SEPARATION

KNOCK-OUT DRUM

Gravity and inertial separation of entrained liquids from relief gas streams prior to atmospheric discharge

KOD Internal Arrangement Horizontal

KOD — Internal Arrangement (Horizontal): Diffuser · Demister Pad · Liquid Sump · Gas In / Gas Out · LG · Drain

Purpose: The Knock-Out Drum is the first stage of liquid separation in the cold vent system. Relief gas from the plant header frequently contains entrained liquid — from condensation in headers, carry-over from process upsets, or direct liquid relief events. If not removed, this liquid will discharge from the vent stack as liquid rain-out, creating a fire hazard and personnel safety risk at grade.

Internal Components: The inlet diffuser dissipates the momentum of the incoming stream, reducing internal velocity below the critical droplet re-entrainment velocity. Larger droplets fall by gravity into the sump. A demister pad (100–150 mm wire mesh or vane type) captures sub-micron mist via inertial impaction and coalescence. The sump provides liquid hold-up volume for accumulated condensate pending controlled drain-down.

ERGIL horizontal Knock-Out Drums — ready for shipment from Mersin facility

STANDARD NOZZLE SCHEDULE

TAG SERVICE TYPICAL SIZE
N1 Gas inlet from header DN 200–600
N2 Gas outlet to seal drum DN 200–600
N3 Liquid drain (closed drain) DN 50–80
N4 Pressure gauge / transmitter DN 25
N5 Level gauge / transmitter DN 50
N6 Manway (inspection access) DN 500–600
04 · COMPONENT · HYDRAULIC SAFETY BARRIER

LIQUID SEAL DRUM

Hydraulic sealing against air ingress, flashback, and reverse flow — the pressure break between the relief system and atmosphere

Hydraulic Sealing Principle: The Seal Drum creates a positive liquid seal between the relief header and the vent stack. The inlet dip pipe terminates below the liquid surface. Gas must overcome the hydrostatic head H of the liquid column before bubbling through to the vent stack — setting a controlled back-pressure on the relief header and preventing atmospheric air from migrating into the flammable gas system.

Flashback & Reverse Flow Protection: Under transient vacuum conditions in the header, the liquid seal prevents air ingress that could form an explosive mixture in the relief piping. The hydraulic barrier responds instantaneously without mechanical moving parts, providing inherently fail-safe protection independent of instrument air, power supply, or operator action.

Final Liquid Separation: Residual liquid mist passing through the KOD impinges on the internal baffle above the liquid surface and coalesces. The outlet nozzle to the vent stack is positioned well above the liquid level, ensuring gas-only flow under all normal and relief conditions.

KEY DESIGN ELEMENTS
  • Dip Pipe: Sets seal depth H; typically 250–600 mm WC
  • Internal Baffle / Demist Zone: Mist impingement; gas/liquid separation
  • Make-up Connection: Auto or manual fill; maintains normal level
  • Overflow to Closed Drain: Prevents liquid overpressure
  • Level Transmitter + Gauge: LSH/LSL alarms; DCS integration
  • Low-Point Drain: Sludge removal and annual cleaning
  • Insulation: Rock wool 50–100 mm + weather cladding
  • Heat Tracing: Electric or steam; for sub-zero ambient
ERGIL cold vent stack liquid seal / seal drum concept drawing

ERGIL cold vent stack liquid seal / seal drum concept drawing

ERGIL liquid seal drums — large-bore horizontal design, Mersin facility

05 · ENGINEERING BASIS

DESIGN PHILOSOPHY & KEY PARAMETERS

Every ERGIL system is engineered to site-specific process conditions, design codes, and environmental criteria

PROCESS DESIGN PARAMETERS

Parameter Typical Range Design Impact
Normal operating flow 1 – 500,000 Nm³/h KOD & stack sizing
Peak relief flow Up to 2,000,000 Nm³/h Stack tip velocity
Gas temperature −196 °C to +650 °C Material selection
Operating pressure Near-atmospheric Wall thickness (FV)
Molecular weight 2 – 120 g/mol Dispersion / buoyancy
H₂S content 0 – 100 mol% NACE MR0175
Liquid carryover 0.1 – 5,000 kg/h KOD sump volume

STRUCTURAL & ENVIRONMENTAL LOADS

  • Wind: ASCE 7 / EN 1991; vortex shedding analysis for H/D > 25; aerodynamic spoilers specified where required
  • Seismic: Site-specific response spectrum; IBC / local standards; anchor bolt design included
  • Thermal expansion: Stack expansion joints or bellows; differential growth between inner and outer shells in double-wall stacks
  • Snow & ice: Applicable for arctic/sub-arctic sites; heat-traced stack options available
  • Corrosion allowance: 1.5–3.0 mm CA on CS; zero CA on SS/Duplex alloys

RELIEF SCENARIOS CONSIDERED

Scenario API 521 §
Fire case (pool fire / jet fire) 5.15.1.2
Blocked outlet 5.15.1.1
Cooling water failure 5.15.1.4
Control valve failure open 5.15.1.5
Reflux failure 5.15.1.6
Utility failure (power/steam) 5.15.1.9
Emergency depressurization 5.20

MATERIAL SELECTION GUIDE

Service Condition Recommended Material
Standard hydrocarbon SA-516 Gr. 70 / P265GH
Low-temperature (≤ −29 °C) SA-516 Gr. 70 + PWHT / P355NL
Cryogenic (≤ −46 °C) 3.5% Ni / 9% Ni / 304L SS
Sour service (H₂S, NACE) HIC-tested plate; NACE MR0175
Acid / high-chloride 316L SS / 2205 Duplex SS
High-temperature (>400 °C) 1.25Cr–0.5Mo / 310 SS
06 · SPECIFICATIONS

TECHNICAL DATA SHEETS

Indicative design parameters — all values are project-specific and subject to ERGIL engineering review and client approval

VENT STACK — TECHNICAL DATA SHEET (INDICATIVE)

Design Parameter Standard Range Code / Standard
Stack height 6 – 120 m (shipped in sections above 40 m) API 521 §5.6
Stack diameter (ID) DN 150 – DN 2,000 Sized for exit Mach ≤ 0.5
Design pressure Full vacuum (FV) / +0.5 barg ASME Sec. VIII Div. 1
Design temperature −46 °C to +450 °C Per process data
Base material CS / 304L SS / 316L SS / Duplex 2205 Per process & site
Corrosion allowance 1.5 – 3.0 mm (CS service) Project specification
Wind design code ASCE 7-22 / EN 1991-1-4 Site-specific wind zone
Surface preparation Sa 2.5 (Near-white blast) SSPC-SP10 / ISO 8501-1
Coating system 3-coat epoxy/polyurethane, min. 250 µm DFT Project painting spec.
NDE requirements 100% RT/UT on all circumferential butt welds ASME B31.3 / PED

KNOCK-OUT DRUM — TDS

Parameter Range / Value
Orientation Horizontal or Vertical
Shell ID 600 – 4,000 mm
T-T length 1,000 – 20,000 mm
Design pressure FV / +1.0 barg
Design temperature −46 / +400 °C
Demister pad 100 mm wire mesh, SS wire
Liquid holdup vol. 10–60 min at design flow
Nozzle rating ASME B16.5 / EN 1092-1
Inspection code ASME Sec. VIII Div. 1
Stamp / marking ASME U stamp / PED CE
Hydro test pressure 1.3 × MAWP (per ASME)

LIQUID SEAL DRUM — TDS

Parameter Range / Value
Orientation Horizontal (standard)
Shell ID 600 – 3,500 mm
Seal depth (H) 250 – 600 mm WC
Seal liquid Water / MEG-water mixture
Design pressure FV / +0.5 barg
Design temperature −46 °C / +200 °C
Level instruments LG + LT (HART) + LSH/LSL
Make-up connection DN 25–50 (auto or manual)
Insulation Rock wool 50–100 mm
Heat tracing Electric / steam (optional)
Inspection code ASME Sec. VIII Div. 1
07 · COMPLETE PACKAGE

OPTIONAL SCOPE & ACCESSORIES

ERGIL supplies complete, ready-to-install packages — from bare equipment to fully skid-mounted, instrumented, and tested systems

STRUCTURAL ACCESSORIES

  • Access platforms & caged ladders — HDG structural steel; GRP grating available for corrosive environments
  • Davit arms — For demister pad R&M access; SS or HDG construction
  • Pipe supports & thermal guides — Stack intermediate supports; expansion guides
  • Anchor bolt assemblies & templates — Per structural calculations; grouted or direct-embed
  • Guy wire systems — SS or galvanized; turnbuckle adjustment; deadman anchors

INSTRUMENTATION PACKAGE

  • Pressure transmitters (PT) — Process-connected; dual redundancy available

  • Temperature transmitters (TT) — Thermowell-mounted; 4–20 mA output
  • Level switches (LSH/LSL) — ATEX/IECEx Zone 1 rated; displacer or float type
  • Make-up water flow indicator (FI)
  • Local indicator panels — Weatherproof GRP or SS enclosures

AVIATION OBSTRUCTION LIGHTING

  • Low-intensity steady red lights (stacks < 45 m) — ICAO Annex 14 compliant
  • Medium-intensity steady red / flashing white (stacks > 45 m)
  • Day/night auto-switching controller
  • Hazardous area rated: Ex d / Ex e; ATEX/IECEx certified

THERMAL MANAGEMENT

  • Mineral wool / rock wool insulation — 50–150 mm thickness; aluminum or SS 316L cladding
  • Electrical heat tracing — Self-regulating or constant-wattage; Ex-rated; freeze protection or process temperature maintenance
  • Steam heat tracing — Where steam utility is available; traced and insulated seal-water loop

SKID-MOUNTED PACKAGES

ERGIL offers fully integrated skid-mounted packages combining the Knock-Out Drum and Seal Drum on a single structural steel baseframe. Benefits include reduced civil scope, pre-tested interconnecting piping, factory acceptance testing (FAT) of the combined unit, and single-lift installation.

MONITORING & CONDITION SYSTEMS

  • Vibration monitor at vent stack base (displacement / velocity)
  • Online gas detection at grade level (H₂S / HC / LEL)
  • Seal drum level telemetry to plant DCS / SCADA
  • Stack structural health monitoring (SHM) — optional
08 · MARKET COVERAGE

INDUSTRIES & APPLICATIONS

ERGIL atmospheric venting systems operate across the full spectrum of hydrocarbon and chemical processing industries

OIL & GAS PRODUCTION

Wellhead and production platform cold vent stacks. Slug catcher KODs. Process separator atmospheric relief. ESD depressurization systems. Offshore wind & seismic design. ATEX Zone 1 instrumentation.

REFINING

Crude distillation unit relief header systems. Vacuum unit barometric condenser stacks. Catalytic cracker relief management. Hydrocracker/hydrotreater H₂ vent stacks. NACE MR0175 sour service KODs.

PETROCHEMICAL

Ethylene/propylene cracker vent stacks. Polymerization reactor relief systems. Aromatic plant (BTX) cold vent systems. Butadiene and styrene relief disposal. Cryogenic service KODs to −196 °C.

LNG & GAS PROCESSING

LNG terminal cold vent stacks. Cryogenic seal drums with MEG freeze protection. Gas sweetening unit relief headers. Amine regenerator vent stacks. BOG compressor relief disposal.

CHEMICAL PLANTS

Chlor-alkali H₂/Cl₂ vent systems. Ammonia and urea plant relief management. Specialty chemical seal drums in exotic alloys. Reactive chemistry emergency vent systems.

FERTILIZER

Ammonia synthesis loop vent stacks. Urea reactor pressure relief systems. Granulation plant KODs. Nitric acid tail gas seal drums. CO₂ recovery unit relief disposal.

HYDROGEN & ENERGY

Green hydrogen electrolyzer vent stacks. SMR/ATR reformer relief systems. Hydrogen storage facility cold vents. Fuel cell plant safety relief disposal. Power-to-X process venting systems.

WATER TREATMENT

Biogas and digester gas vent stacks. Wastewater H₂S relief systems. Anaerobic digestion plant safety venting. Desalination facility relief management. Chemical dosing area vent systems.

TANK FARMS & TERMINALS

Bulk liquid terminal tank vent stacks. Loading arm vapour recovery backup. Fuel storage pressure management. Blending facility relief header systems. Import/export terminal ESD vent systems.

09 · COMPETITIVE ADVANTAGE

THE ERGIL DIFFERENCE

A single-source engineered solution — from process datasheet to commissioned and handed-over system

ASME U ASME U2 EN AD 2000 PED/CE ISO 9001 ATEX IECEx

FULL PROJECT EXECUTION — STAGE BY STAGE

01 Inquiry Review & Process Engineering
Datasheet review, sizing basis, code selection, hazard identification

02 Detail Engineering
Mechanical calculations, GA drawings, material specs, nozzle schedules

03 Document Submission & Client Approval
ITP, GA drawings, datasheet and specification approval

04 Fabrication & Third-Party Inspection
Witnessed by client and/or TÜV, BV, LRQA, DNV, SGS

05 Testing & Certification
Hydrostatic test; NDT; painting; code stamping; name plate

06 Packaging & Logistics
Sea-worthy crating; export documentation; multi-modal shipping

07 Site Supervision & Commissioning Support
Resident engineer; pre-commissioning; seal filling; handover documentation